Vision Test ChartRed and Green Card
Taining Method:
1. The trainer wears red and green glasses and fixes the same set of cards with variable vector images on the training bracket at a distance of 40 cm to ensure the stability of the sliding.
2. Red and Green Card Two cards with the same red and green grouping numbers are used as a group for training. No. 01-03 gradually increases the training difficulty.
3. Aim the green card scale pointer at the zero scale of the red card, fuse within 3-5 seconds, maintain a clear image, and maintain the fusion state for 10 seconds.
4. Pull Red and Green Card at a constant speed by an amount of 2, and gradually increase the training difficulty. Pull the red card to the right for collective training, and the lower scale is the collective separation amount; pull the green card to the right, and the upper scale is the scattered separation amount; the collective reaches 30△BO , the spread reaches 15△Bl.
1. Group 01 performs peripheral fusion training. After fusion, you will see a large circle surrounded by four small circles.
2. Group 02 trained peripheral fusion and stereopsis. After fusion, they saw two large circles in the middle and four small circles around them. The rings had a three-dimensional feeling (convex or concave). As the gaze time increased, the three-dimensional feeling became more and more obvious. The stronger.
3. Group 03 trained peripheral fusion, stereoscopic vision and foveal gaze. After fusion, they saw two large circles in the middle and four small circles around them. The rings had a three-dimensional feel (convex or concave), and the □, X, and O On the same vertical line, as the gaze time increases, the floating feeling of the central ring becomes stronger and stronger, and "x" also feels floating.
4. When training together, the fused image will become closer and smaller; when training separately, the fused image will become farther and farther away, becoming larger and larger.
Processing time
According your order list. we will supply delivery time .
Commonly is 5-7 work days after we confirm payment
Shipping time
By Express : 3-7 days . Door to door service
By Air : 3-7 days . (the goods arrival at your local air ports
By sea : 30-40 days (the goods arrival at your local sea ports )
PS : by air or by sea, if you need door to door service, please tell us . we will help you checking the extra door to door cost.
How many months warranty do you provide ?
one year
What should I do if the machine have question ?
For ensuring all the items are in good quality, we will test all products before the packages were sent out. Once the machine have some question, please don't worry. kindly send us some images of the situation , Video and machine series, and explain the question in where . we will supply solution to you deal soon.
What should I do if the spare parts is broken in Warranty ?
If in Warranty, some spare parts broken in the Use. kindly supply picture or video , and machine series number .
We will send the spare parts by express to you soon.. and we bear express cost .
Please enter your target price
Please provide a quantity
United States
Please provide your name
Please enter your email adress
Enter a valid email address
Please enter the phone number
Please enter the inquiry information
LINK-PP LPJ1075-1BHNL 100% Cross RTA-110AHQ1A UDE
United States
Carrier
CostDelivery TimeTracking
Bruce Frame Red and Green Fixed Variable Vector Graphics Bruce Frame Visual Training RD009
